Peanut Butter Machine Manufacturer in Rajasthan
Peanut butter processing machinery for Rajasthan food businesses — roasters, blanchers, grinders and filling systems in food-grade stainless steel, delivered and commissioned across Bikaner, Jaipur, Jodhpur and Alwar.
- Power
- 415V 3-phase, 50Hz standard
- Capacity
- 100 – 1,000+ kg/day
- Construction
- SS304 standard, SS316 optional
- Coverage
- Bikaner, Jaipur, Jodhpur, Nagaur, Alwar, Sikar
- Road Transit
- 2 days from Rajkot
- Included
- Installation, commissioning & training
Peanut Butter Machines
for Rajasthan
Rajasthan is India’s second-largest groundnut producer, and Bikaner sits at the centre of it. Yet most of that crop still leaves the state as raw kernels or bulk oil — the branded, packaged end of the value chain is thinly served relative to the volume grown here. For a processor, that is an unusual position: abundant local raw material and comparatively little local competition for the finished product.
We manufacture the machinery at Jam Kandorna in Rajkot district, roughly two days by road. More than 500 machine installations and over 100 turnkey projects across 25+ states since 2004, with installation, commissioning and operator training included as standard.
From Raw Groundnut to Filled Jar
Order the full sequence as one integrated package, or individual machines to fill gaps in an existing setup.
Every Machine We Manufacture
Twenty machines across six categories — supplied individually or as a fully integrated line.
Choose Capacity for Your Market
Over-specifying is the most common and most expensive mistake we see. Buy for the demand you can prove, not the demand you hope for.
Starter Line
100–150 kg/dayNew brand serving Jaipur, Bikaner and regional general trade.
- Compact roaster
- Single-stage grinding
- Semi-automatic filling
- 800–1,200 sq ft footprint
Growth Line
300–500 kg/dayEstablished processor supplying modern trade across Rajasthan and the NCR belt.
- Rotary roaster and cooling belt
- Blanching stage included
- Two-stage grinding
- 2,500–4,000 sq ft footprint
Industrial Line
1,000+ kg/dayContract manufacturer, or an existing oil mill adding branded capacity.
- Continuous roasting
- Automated blanching
- In-line filling and labelling
- Bulk storage tanks
Rajasthan’s advantage is raw material, so spend the saving on grading. Being a producing state means competitive kernel supply, which is exactly why intake screening pays here rather than being trimmed from the machine list. Buy the sorting and sieving stage properly and let proximity fund it.
Machinery is supplied nationwide from our Rajkot works — only freight to site differs. Budget separately for premises, pollution-board consent, electrical load sanction, internal wiring and civil work. See our plant investment guide, profit margin analysis and automation comparison.
Four Reasons Rajasthan
Works as a Production Base
Second-Largest Producer
Bikaner, Nagaur, Churu, Sikar and Hanumangarh grow groundnut in volume. Kernel supply is local, competitive and does not depend on an inter-state haul.
Under-Served Value Chain
Most of the crop leaves as raw kernels or bulk oil. Branded packaged peanut butter is thinly served relative to production, which is a rare combination for a new entrant.
NCR and North Access
A plant here reaches Delhi NCR, Punjab, Haryana and Gujarat on good highway infrastructure, so you are not confined to in-state distribution.
Affordable Industrial Land
RIICO estates offer developed plots at a fraction of metro rates, which makes it realistic to design a layout with expansion space from day one.
Setting Up in Rajasthan
The order these happen in matters. Pollution-board consent and load sanction routinely take longer than machine manufacture.
Secure the Plot
RIICO estates at Bikaner, Jaipur, Jodhpur or Alwar are the usual route — confirm the plot permits food processing before committing.
Registrations
FSSAI, GST, Udyam and the local trade or factory licence.
Consent & Load
Apply to the Rajasthan State Pollution Control Board for consent and to JVVNL, AVVNL or JdVVNL for sanctioned load.
Civil & Electrical
Flooring, drainage and wiring completed against our layout and foundation drawings.
Delivery & Commissioning
2 day road transit from our Rajkot works, then installation and operator training on site.
Apply for load sanction early. We issue a connected-load schedule with every quotation precisely so you can start this before the machines are built. Metering and sanction routinely take longer than manufacture, and it is the most common reason commissioning slips.
Siting a Peanut Butter
Plant in Rajasthan
RIICO estates are spread across the state, and the choice is mostly about balancing crop proximity against distribution reach.
Bikaner Belt
Bikaner puts you inside the growing region with the shortest kernel haul and an established agri-processing base. The natural choice if raw material access drives the decision.
Jaipur & Alwar
Jaipur offers the state’s largest consumer market and better contractor availability. Alwar and the Bhiwadi belt sit closest to Delhi NCR distribution.
Space You Will Need
A 100–150 kg/day line needs roughly 800–1,200 sq ft; a 500 kg/day line 2,500–4,000 sq ft. Land costs here allow generous expansion room.
Sourcing and Delivery
Rajasthan grows its own groundnut, principally around Bikaner, Nagaur, Churu, Sikar and Hanumangarh, with Gujarat a short haul away if you need a different grade.
- Local supply keeps moisture stable, which means fewer roast-profile corrections between deliveries than an out-of-state plant will manage.
- Arid-climate kernels behave differently. Expect to set your roast profile for local stock rather than lifting settings from a Gujarat or Andhra operation.
- Aflatoxin management starts at intake. Keep the sorting table and vibratory sieve in the machine list — rejecting kernels at intake is far cheaper than a failed FSSAI test on finished stock.
- Machinery delivery from our Rajkot works is roughly two days by road, with the commissioning team following.
Licences for a Rajasthan Unit
- FSSAI manufacturing licence — State licence for most units; Central licence above the turnover threshold or if you plan to export.
- GST and Udyam (MSME) registration — the latter unlocks most subsidy and priority-lending schemes.
- Rajasthan State Pollution Control Board consent to establish and consent to operate.
- Factory licence from the state labour department, plus fire NOC depending on built-up area.
- Legal Metrology packer registration if you sell pre-packaged retail — it governs how your label declares net quantity.
Rules and thresholds change periodically. Treat this as an orientation checklist, not a compliance reference, and confirm the current position with a local consultant. Our guide to FSSAI compliance for peanut butter manufacturers covers the food-safety side in depth.
Power & Load Planning
Rajasthan runs standard 415V three-phase 50Hz supply through JVVNL, AVVNL or JdVVNL depending on your district. Industrial supply across the RIICO estates is generally dependable, so most units size a backup set for grinding and filling only.
| Line capacity | Indicative connected load |
|---|---|
| 100–150 kg/day | 15 – 25 kW |
| 300–500 kg/day | 40 – 60 kW |
| 1,000+ kg/day | 85 – 130 kW |
Peanut Butter Machines in Rajasthan
Yes. We manufacture at our Rajkot, Gujarat facility and deliver across Rajasthan. Road transit is approximately 700–1,000 km and typically takes about two days once the machine is dispatched. Installation, commissioning and operator training are part of our standard supply.
Typically an FSSAI manufacturing licence, GST registration, Udyam (MSME) registration, a factory or trade licence from the local authority, and consent to establish and operate from the Rajasthan State Pollution Control Board. Legal Metrology packer registration applies if you sell pre-packaged retail. Requirements change periodically, so verify current rules with a local consultant.
RIICO estates across the state are the usual route. Bikaner puts you inside the growing region with the shortest kernel haul and an established agri-processing base, Jaipur offers the largest consumer market and better contractor availability, and the Alwar and Bhiwadi belt sits closest to Delhi NCR distribution.
Standard Indian 415V three-phase 50Hz. A 100–150 kg/day line typically needs 15–25 kW sanctioned load; a 300–500 kg/day line generally needs 40–60 kW; a 1,000 kg/day line 85–130 kW. We issue a connected-load schedule with every quotation so you can apply for the correct sanctioned load before the machines arrive.
Yes, as part of our standard supply. Training covers roast profiling, grinder gap setting, cleaning and changeover routines, and preventive maintenance. Layout and foundation drawings are supplied ahead of delivery so civil and electrical work can be completed before the machines arrive.
It is underrated. Rajasthan is India’s second-largest groundnut producer, yet most of the crop leaves the state as raw kernels or bulk oil — branded packaged product is thinly served relative to the volume grown. That combination of abundant local raw material and limited local competition for the finished product is unusual.
Locally — Bikaner, Nagaur, Churu, Sikar and Hanumangarh all grow it in volume, with Gujarat a short haul away if you need a different grade. Note that arid-climate kernels behave differently through roasting, so set your profile on local stock rather than lifting settings from a Gujarat or Andhra operation.
Planning a Peanut Butter Plant in Rajasthan?
Tell us your target output, packaging format, whether you need smooth, crunchy or both, and your district. We will come back with a machine list, a layout drawing and a firm price.